BlueMtnData

170 acres for 400 MW of data centres

Phase 1 – 2028/29

20 acres for 25 MW connected to the Alberta Electric Grid.

Phase 2 – 2029/30

100 acres for 375 MW connected to the Alberta Electric Grid.


Phase 3 – 2030/31

50 acres for 200-400 MW connected to onsite power.