BlueMtnPark
Main development company, 200 acres of land
Phase 1 – 2028/29
20 acres with basic utilities consistent with heavy industrial development for data centers connecting to the Alberta Electric Grid through the Fortis AB distribution system.
Phase 2 – 2029/30
100 acres with basic utilities consistent with heavy industrial development for data centers connecting to the Alberta Electric Grid through the Altalink Transmission system.
Phase 3 – 2030/31
80 acres with basic utilities consistent with heavy industrial development for data centers and onsite natgas-to-power generation.