BlueMtnPark

Main development company, 200 acres of land

Phase 1 – 2028/29

20 acres with basic utilities consistent with heavy industrial development for data centers connecting to the Alberta Electric Grid through the Fortis AB distribution system.


Phase 2 – 2029/30

100 acres with basic utilities consistent with heavy industrial development for data centers connecting to the Alberta Electric Grid through the Altalink Transmission system.


Phase 3 – 2030/31

80 acres with basic utilities consistent with heavy industrial development for data centers and onsite natgas-to-power generation.